CIW continuous retaining wall

CIW_Features/Advantages of Overlap Drilling


  • CIW The construction method was developed as “ply casing pile” to apply continuous wall construction.
  • In the perforation structure, the soil inside the casing is perforated with Auger & Hammering.
  • The casing is mounted on the auger and the auger is driven by two independent motors.
  • By extending the auger or air hammer mechanism, it is possible to drill deeper than the length of the incoming casing.
  • The pile is filled with concrete through the screw rod mounted on the auger while the drilling device is being recovered, and starting with the primary drilling at intervals, the secondary drilling is performed to ensure proper overlapping construction.
  • The inside of the completed pile is filled with stress reinforcing materials such as unreinforced or H-beams and reinforcing bars, and construction can be performed in a different order according to site conditions or an agreement with the contractor.